HelloSubway
Typing game

Tokyo subway typing game

Type the station names of 14 Tokyo subway lines and ride them on the map. Choose a line below, or ride every line in a one-minute Express run.

Tokyo's first subway, now part of the Ginza Line, opened on December 30, 1927, between Ueno and Asakusa. It was the first subway in East Asia. The businessman behind it had seen the London Underground on a trip in 1914. Tokyo today has two subway operators, Tokyo Metro and Toei, and JR East's Yamanote loop runs above ground.

Most stations have a code made of a letter and a number, such as G for Ginza and M for Marunouchi. HelloSubway has the Tokyo Metro and Toei subway lines plus the Yamanote Line.

In Japanese mode you read the kanji name and type the romaji. The common spellings are all accepted (shi or si, chi or ti, tsu or tu), and you do not need a Japanese IME. Difficulty here is counted in Latin letters, since that is what you type.

Lines in Tokyo

  • Asakusa Line20 stations · Lv 2/7 · ~210 keystrokes

    Toei's first subway line, it opened as Line 1 on December 4, 1960 between Asakusabashi and Oshiage, starting through-service with Keisei Electric Railway from day one. Extensions southward brought it to Daimon and, on June 21, 1968, to Sengakuji, where through-service with Keikyu began; the final stretch to Nishi-magome opened on November 15, 1968, completing today's 20-station route. It was renamed the Asakusa Line on July 1, 1978, added through-service with Hokuso Railway in 1991, and since 1993 trains have run through to Haneda on the Keikyu line.

  • Chiyoda Line19 stations · Lv 2/7 · ~205 keystrokes

    Opened on December 20, 1969 between Kita-Senju and Otemachi, it reached Kasumigaseki on March 20, 1971, and the Ayase–Kita-Senju section followed on April 20 of the same year, starting through-service with the JR Joban Local Line. It was extended to Yoyogi-koen in 1972 and completed to Yoyogi-Uehara in 1978, adding through-service with the Odakyu Odawara Line. The Kita-Ayase branch, which splits off at Ayase, was originally built as a depot connection and began carrying passengers in 1979.

  • Ōedo Line38 stations · Lv 5/7 · ~478 keystrokes

    Operated by the Tokyo Metropolitan Bureau of Transportation (Toei), this line opened in stages, Hikarigaoka to Nerima on December 10, 1991, with the full line completed on December 12, 2000. Shaped like a sideways figure 6, it runs a radial spur between Tochomae and Hikarigaoka plus a loop through central Tokyo, but it is not a true loop line: Hikarigaoka-bound trains circle the loop once and reverse direction at the intermediate Tochomae station. It runs deeper underground than any other Tokyo subway line (as low as 48m) and was the first in Tokyo to use compact, linear-motor-propelled cars.

  • Fukutoshin Line16 stations · Lv 2/7 · ~204 keystrokes

    Opened June 14, 2008, the newest of Tokyo Metro's lines and its deepest, running an average of 27m below ground. It is the only line that connects all three of Ikebukuro, Shinjuku, and Shibuya. It shares track with the Yurakucho Line between Wakoshi and Kotake-mukaihara, and since March 16, 2013 has run through services with the Tokyu Toyoko Line and Minatomirai Line at Shibuya.

  • Yurakucho Line24 stations · Lv 3/7 · ~269 keystrokes

    Opened on October 30, 1974 between Ikebukuro and Ginza-itchome, it was extended to Shintomicho in 1980, to Chikatetsu-narimasu in 1983, to Wakoshi in 1987, and to Shin-kiba on June 8, 1988, completing today's 24-station route. It shares track with the Fukutoshin Line between Wakoshi and Ikebukuro, and runs through services onto the Tobu Tojo Line at Wakoshi and the Seibu Yurakucho Line at Kotake-mukaihara.

  • Ginza Line19 stations · Lv 1/7 · ~194 keystrokes

    Opened in 1927 between Asakusa and Ueno, the first subway line in East Asia. Extended in stages until reaching Shibuya in 1939, it took its current form; the name "Ginza Line" was adopted in 1953 to distinguish it from the newly opened Marunouchi Line.

  • Hanzomon Line14 stations · Lv 1/7 · ~160 keystrokes

    First opened on August 1, 1978 between Shibuya and Aoyama-itchome, the line reached its current full route of 14 stations between Shibuya and Oshiage on March 19, 2003, when the Suitengumae–Oshiage segment opened. It runs through services onto the Tobu Skytree Line north of Oshiage and the Tokyu Denentoshi Line south of Shibuya.

  • Hibiya Line22 stations · Lv 2/7 · ~212 keystrokes

    Opened in stages from March 1961, with the full line between Naka-meguro and Kita-Senju completed on August 29, 1964, just ahead of that October's Tokyo Olympics. It was the world's first subway line designed from the start for mutual through-running with private railways, connecting to the Tobu Isesaki Line at Kita-Senju and the Tokyu Toyoko Line at Naka-meguro.

  • Yamanote Line30 stations · Lv 3/7 · ~268 keystrokes

    JR East's loop line circling central Tokyo. It traces back to the Shinagawa Line between Shinagawa and Akabane, opened in 1885; after the Toshima Line between Ikebukuro and Tabata opened in 1903, the two were merged in 1909 and named the Yamanote Line. Completion of the elevated Ueno–Tokyo section in 1925 started true loop service, and Takanawa Gateway, the first new station in 49 years, opened on March 14, 2020, bringing the line to its current 30 stations.

  • Marunouchi Line25 stations · Lv 3/7 · ~291 keystrokes

    Opened January 20, 1954 between Ikebukuro and Ochanomizu, the second subway line in Tokyo after the Ginza Line (and the fourth in Japan). Extended in stages until reaching Ogikubo in 1962, it took its current mainline form. A branch to Honancho (completed 1962, originally its own "Ogikubo Line") splits off at Nakano-sakaue.

  • Mita Line27 stations · Lv 3/7 · ~316 keystrokes

    Operated by the Tokyo Metropolitan Bureau of Transportation (Toei), the line first opened between Sugamo and Kosuge on December 27, 1968. Successive extensions reached Meguro on May 6, 1976 and Nishi-takashimadaira on September 26, 2000, completing today's full 27-station route between Meguro and Nishi-takashimadaira. It runs through services onto the Tokyu Meguro Line south of Meguro and the Saitama Rapid Railway Line north of Nishi-takashimadaira.

  • Namboku Line19 stations · Lv 2/7 · ~202 keystrokes

    First opened on November 29, 1991 between Azabu-juban and Tamachi, the line reached its current full route of 19 stations between Meguro and Akabane-iwabuchi on September 26, 2000, with the Meguro extension. It shares tracks with the Toei Mita Line between Meguro and Shirokane-takanawa, and runs through services onto the Tokyu Meguro Line south of Meguro and the Saitama Rapid Railway north of Akabane-iwabuchi.

  • Shinjuku Line21 stations · Lv 2/7 · ~216 keystrokes

    Operated by the Tokyo Metropolitan Bureau of Transportation (Toei), it first opened on December 21, 1978 between Iwamotocho and Higashi-ojima. The Shinjuku–Iwamotocho section followed on March 16, 1980, and the line was pushed east to Funabori on December 23, 1983 and Shinozaki on September 14, 1986, before reaching Motoyawata in Chiba Prefecture on March 19, 1989, completing today's 21-station route. At Shinjuku in the west it runs through onto the Keio Line.

  • Tozai Line23 stations · Lv 2/7 · ~233 keystrokes

    Opened in stages from December 1964, with the final Toyocho–Nishi-Funabashi section completing the line on March 29, 1969. It was the first Eidan (now Tokyo Metro) line to cross out of Tokyo into another prefecture (Chiba), and connects to the JR Chuo Line at Nakano and the JR Sobu Line at Nishi-Funabashi.

Stories about Tokyo

Read the Tokyo line guide or go back to all cities.